Pipe Isolation at Old Admiralty Building

Two Butterfly Valves, Extended Pipework and New ‘Ts’ fitted

 

 

 

 

 

Site Location – Old Admiralty Building, London, SW1

Contract Duration – For one evening/night

Pipe Freezing Services

Pipe Freezing Services

 

Pipe Freezing with Liquid Nitrogen

 

Highlights of Services Completed Included

Our experienced engineers attended the prestigious site out of hours.

Firstly, to stop the pipework flow, we carried out eight pipe freezes – four on the LTHW pipe and four on the chilled pipe.

Once the flow had stopped, in between the freeze jackets, our engineers cut two new T’s on to the existing LTHW and chilled pipework.

The pipework was then extended inside.

For new servicing, our engineers supplied and installed two new 2.5” Butterfly Valves inside of the building for future use.

The pipework was then allowed to thaw, and we carried out the necessary safety checks.

 

Result

Everything was left in good working order.

Our engineers left the site clean and tidy, with all redundant parts being disposed of at a licensed refuse/recycling facility.

Lastly, the client was happy that in the future they can add a new line.

 

Pipe Freezing Contractor

For further details on IDWe Ltd Pipe Freezing Services, please click here.​

Get a quote, please call 020 8302 7644 or email info@pipefreezers.co.uk

For all services IDWe Ltd offers, please click here.

Want to keep up to date with IDWe Ltd’s news & projects? Follow us on social media: Facebook, X & LinkedIn.