Nestled in the heart of Mayfair, Claridge’s Hotel is synonymous with luxury and heritage. To maintain this reputation and accommodate their ambitious refurbishment and extension plans, the team at Claridge’s Hotel required a seamless solution to isolate their chilled water (CHW) system. That’s where IDWe Ltd Pipe Freezing Contractors stepped in.
Our engineers provided two liquid nitrogen pipe freezes to the chilled water pipework to stop the flow and allow works to be competed by Stothers (M&E) Ltd.
We delivered a precision-driven service that ensured minimal disruption and maximum efficiency through the project.
As a trusted London Pipe Freezing Contractor with over 30 years of experience, we successfully isolated the chilled water pipework system to facilitate essential maintenance. Below, you’ll find detailed information about this project:
Pipe Freeze to Install New Valves
A step-by-step breakdown of the process:
1. Site Access and Preparation
Our engineers began by accessing the CHW pipework via step ladders, ensuring all safety measures were in place. Any existing pipework insulation that obstructed our work was carefully removed, preserving the integrity of surrounding pipework systems.
2. Pipe Freezing with Liquid Nitrogen
The core of our work involved two 76mm liquid nitrogen freezes. This method temporarily isolated sections of the chilled water system without requiring a full system shutdown. A freeze jacket was expertly installed around the pipework, ensuring a secure and effective freeze to facilitate the next stage of operations.
3. Collaboration with On-Site Teams
With the pipework isolated, Stothers (M&E) Ltd could safely install the new valve connections. This collaborative approach highlights our commitment to working seamlessly alongside project partners to achieve shared goals.
4. Final Checks and Restoration
Once the valve connections were in place, we released the freeze and performed meticulous checks for leaks. After verifying the system’s safety checks, we reinstated the previously removed insulation, leaving the pipework as good as new.
5. Site Clearance and Waste Disposal
We cleared the site of any redundant materials and disposed of waste at a licensed refuse and recycling facility, ensuring we left the workspace pristine and ready for the next phase of the project.
Why Choose IDWe Ltd for Your Pipe Freezing Needs?
In conclusion, our work at Claridge’s exemplifies the hallmarks of IDWe Pipe Freezing Contractors: precision, professionalism, and a commitment to excellence. As well as providing pipe freezing for contractors to carry out works, our team also supply & install valves as another service.
How can we help you?
As a leading Pipe freezing, Hot Tapping, Electrical and HVAC contractor we provide the best value for your specific needs.
Talk to our specialist team on 020 8302 7644 or email info@idwe.co.uk
As well as Valve Fitting Services, discover our Hot Tapping Services and Pipe Welding Services
View all services IDWe Ltd offer
Would you like to keep up to date with IDWe Ltd’s news & projects? Follow us on social media: Facebook, X & LinkedIn.
Offering quality services for over 30 years across London, Kent, Surrey, Essex, Sussex and the surrounding areas.